Works
After all these years we wanted change and novelties.
Our project started during the first confinement, the idea was to recreate a more modern and sober storefront.
Several ideas were proposed to us, but a choice had to be made. After long reflections, our choice is made and the adventure can begin.
The second confinement slowed down our project, but we were able to start the work.
In mid-May, we began the adventure by dismantling the canopies of the entire façade. Rather complicated, to go to the 4th floor. We used a nacelle to be able to dismantle everything.
Our project continued with the dismantling of the front door. Which has given way to an electric door for more comfort and to facilitate your arrival with your suitcases.
After all this dismantling, there was a need for new things. After validation with the city of Caen, a new, more modern and sober sign was installed.