Works


After all these years we wanted change and new things.

Our project began during the first confinement, the idea was to recreate a more modern and sober storefront.

Several ideas were proposed to us, but a choice had to be made. After much thought, our choice is made and the adventure can begin.

The second confinement slowed down our project, but we were able to start work.

 

In mid-May, we began the adventure by dismantling the canopies from the entire facade. Rather complicated, to get to the 4th floor. We used a cherry picker to be able to dismantle everything.

Our project continued with the dismantling of the front door. Which has given way to an electric door for more comfort and to make it easier for you to arrive with your suitcases.

After all this dismantling, there was a need for new things. After validation with the city of Caen, a new, more modern and sober sign was installed.

 

This project was close to our hearts, to create a facade in our image.

It's up to you to come and discover all its new features, which we hope you will like.

hotel chateau caen facade work-on-facade-hotel-du-chateau work-facade-dismantling-panel-hotel facade-hotel-sans-marquise installation-of-new-entrance-door front door work new-electric-entrance-door


All the news